Our Process
Pre-Install Verification & Quote
1
We complete a free on-site pre-install verification to confirm suitability and readiness at the time of inspection. You’ll receive the verification document attached with a defined written quotation.
-
Areas being waterproofed + any high-risk details
Substrate readiness and critical junctions/penetrations
Timing, access, and trade sequencing before install
Systematic Installation
2
We complete the waterproofing using a consistent, step by step method, including preparation, critical detailing, and full primary membrane application. The job is kept clean, controlled, and sequenced correctly to reduce defects and return visits.
-
Surface preparation + critical detailing (junctions, penetrations, setdowns)
Apply the primary membrane, then return after screed to apply the above-screed membrane
Keep sequencing controlled and work documented with site photos/checkpoints
Stage Verification
3
Before screed is laid, we verify the completed primary membrane and capture the key evidence from this stage while everything is still visible.
-
DFT (dry film thickness) readings recorded at this stage where applicable
Stage photo set of key details and coverage
Flood testing where applicable
4
Final Documentation
Once complete, you receive a clear, organised Digital Handover Pack that’s easy to store, share, and refer back to.
-
Digital Handover Pack (PDF) with scope, key notes, and completion details
Photos organised by stage (so it’s easy to follow and forward on)
If optional enhancements are included, they’re clearly listed and documented
What you can expect from Zyron is clear scope, controlled installation, and documentation that is organised and easy to share.